UK Diveworks for highest standards in swimming pool dry refurbishments

UK Diveworks has extensive experience and knowledge when it comes to swimming pool refurbishment. Although our company name suggests we only work underwater, our expertise extends in to the world of drained down pool refurbishment.

Trusted by clients such as David Lloyd and Freedom Leisure to complete dry refurbishment works, UK Diveworks offers refurbishment project works to a variety of leisure facilities. Whether you have a large leisure centre complex, a health spa pool, hydrotherapy pool or a highend hotel spa pool. UK Diveworks caters for all pool refurbishment projects.

Our specialist services include:

  • Full Strip out and pool wall and floor levelling
  • Re-screed works
  • Re-render works
  • Waterproof tanking installation
  • Professional tiling service
  • Swimming Pool depth reduction service (installation of concrete floor to raise the depth to a shallower level)
  • Full project management of swimming pool refurbishment

The use of swimming pool graded products supplied by manufacturers such as Ardex and Mapei are always used throughout our projects that give peace of mind during and beyond the works. We use vitrified tiles to ensure that water cannot ingress into the tile structure and breakdown integrity.

All of our pool refurbishments come with a 2 year guarantee from completion date.

If you are planning a refurbishment and would like to speak to us, then please call Andy Wilkins on 01202 932933 or email andy.wilkins@ukdiveworks.co.uk

Littledown Leisure Centre
Refurbishment of tiling to the bottom of a flume landing pool at Littledown Leisure Centre along with the retile of the entry staircases.
read more...

David Lloyd Woking
Work Scope: Full strip out of pool tank, re-tanking of pool shell and new tile installation. All fixtures and fittings were removed and replaced.
Duration: 6 weeks
read more...

Royal Alexandra and Albert School
Full dry refurbishment to pool tank including new sump drain installation and tanking install
read more...

Shere Community Pool
Full dry refurbishment to pool tank including new sump drain installation, concrete pour to decrease depth level, pipework installation from pool plant room to pool tank, tanking install, tile install. Poolside walk way relaid with paving slabs. New ladder installation.
read more...

Hailsham Leisure Centre
Project: Hailsham Leisure Centre Dry Refurbishment
Workscope: Total Square Meterage – 600sqm
Time scale of works – 10 weeks
Completed in – 10 weeks
read more...