Full dry refurbishment to pool tank including new sump drain installation and tanking install
Work Scope: Full Underwater pool floor retile including strip out.
Duration: 4 weeks
Work scope: Underwater Conditional Survey, full underwater grout removal and full underwater re-grout, underwater light repairs, underwater tile repairs.
Duration: 13 weeks